Not with the size of kettle the sales staff use, Sandra

No mains gas connected yet Ray, no gas bottles allowed.
Having a great time setting up the apartment

plenty of work taking place, the area where the build up of rain water collected is now being rectified by UGR
The grass around the swimming pool at our end M12 blocks 9- onwards growing quite quickly and will need a cutting soon

Has Roy posted the above pool, has now been cleaned and in the process of being filled.
Work still taking place on the links pool, and the pool near the commercial centre is still a little dirty i guess these will be cleaned and filled once the M12 pools are all completed.
Sorry this post has nothing to do with shower screens

Dave